Public workspace

Hewatt Go Seed Workspace

Seeded review workspace for local UI and workflow checks.

Documents

Field documents

0 shown

No field PDFs selected yet.

Project status

Current checklist progress across open work.

0% Project progress
0/3 tasks 0/5 checklist 0/8.00 hours

Task groups

Open each group to review tasks, panel runs, and checklist work.

1 task groups · 1 panels · 1 runs
Rough-in checklist 2 open 2 tasks
Install branch conduit Kitchen and corridor branch runs.

Complete every checklist item before closing this task.

Details
Layout boxes 1.50h
Pull branch conductors 2.00h
Label home runs Mark panels and destination rooms.
Details

No checklist items on this task yet.

Panel LP-1 120/208V 3 open 3 items 1 run

Runs

1
Run LP-1 to Kitchen 3/4" conduit · 1 row
LP-1 to Kitchen line
Load Circuit Details
Dishwasher 1 1P · 20A · 120/208V · #12
Run checklist · 1
Pull feeder conductors 2.50h

Panel tasks

1
Trim LP-1 Panel trim, breaker labels, and final torque.

Complete every checklist item before closing this task.

Details
Torque panel lugs 0.75h

Circuits not on a run

0

Every saved circuit in this panel is already on a run.