Public workspace

Review Workspace

Phase 3 checkpoint

Documents

Field documents

1 shown

Project status

Current checklist progress across open work.

0% Project progress
0/1 tasks 1/2 checklist 2.00/3.50 hours

Task groups

Open each group to review tasks, panel runs, and checklist work.

1 task groups · 2 panels · 2 runs
Rough-in 1 open 1 tasks
Install feeder Pull and terminate feeder

Complete every checklist item before closing this task.

Details
Terminate A phase 1.50h
Panel test Voltage not set 0 open 0 items

Runs

0

No conduit runs are assigned in this panel yet.

Panel tasks

0

No panel-related tasks.

Circuits not on a run

0

Every saved circuit in this panel is already on a run.

Panel RGA Voltage not set 0 open 1 items 2 runs

Runs

2
Run RGA1 Size not set · 1 row
RGA
Load Circuit Details
qui 1 1P · 20A
Run checklist · 0

No checklist items on this run yet.

Run RGA2 3/4" conduit · 1 row
RGA
Load Circuit Details
savd 3 1P · 30A
Run checklist · 0

No checklist items on this run yet.

Panel tasks

0

No panel-related tasks.

Circuits not on a run

0

Every saved circuit in this panel is already on a run.